TRACODI CONSTRUCTION HOLDINGS JOINT STOCK COMPANY 
  • Construction Value: $101 million
  • Estimated infrastructure cost: USD 10 million
  • Capacity: 100 MW.
  • Land area: 120 ha.
  • Construction period: 2018 – 2019. 
 

The GAIA Solar Power Plant will be located in Thanh Hoa (Long An) owned by its parent company Bamboo Capital JSC (BCG) and BCG’s partner Hanwha (Korea). The project has been approved by Ministry of Industry and Trade and in the procedure of preparation of infrastructure construction documents.

TCD will play a role as general contractor who provides design solution, equipment and installation for solar energy system for the project.

Other news

GAIA

GAIA

  • Construction Value: 101 million dollars
  • Investment Life: 20 years
  • Status: In construction
 
VNECO VINH LONG

VNECO VINH LONG

  • Construction Value: 34.5 million USD
  • Capacity: 50 MW
  • Schedule: 2020