TRACODI CONSTRUCTION HOLDINGS JOINT STOCK COMPANY 
  • Construction Value: 101 million dollars
  • Investment Life: 20 years
  • Status: In construction
 

Overview

Long An Province is located in a tropical area near the equator with monsoon climate and humidity.

Abundant sunshine, long-lasting radiation.

Average duration of sunshine around 4.9 kWh/m2 per day (PVSYST).

Details

Location Long An Province
Capacity 100 MW
Power Generation Capacity Up to 157,000 MWh/year
Land Area 125 ha
Technology Using photovoltaic solar panels (PV) to directly connect to the grid (on-grid) 110kV/220kV line
Grid Distance 28 km
Electricity Revenue (Avoided Costs) 0.0935 $/kWh
Current Project Status Under Construction; 40MWp COD before June 30, 2019; 60MWp COD in 2019
Investment Type BOO ( Build – Own – Operation)
Legal Status Completed

Other news

VNECO VINH LONG

VNECO VINH LONG

  • Construction Value: 34.5 million USD
  • Capacity: 50 MW
  • Schedule: 2020
 
BCG – CME LONG AN 1

BCG – CME LONG AN 1

  • Construction Value: $47,3M.
  • Capacity: 40.6 MW
  • Estimated completion: 2019
  • Investment Life: 20 năm