- Construction Value: $40.5 million
- Estimated infrastructure cost: USD 5 million
- Capacity: 40 MW.
- Land area: 50 ha.
- Construction period: 2018 – 2019
The BCG Bang Duong Solar Power Plant will be located in Thanh Hoa (Long An) owned by its parent company BCG. The project has been approved by Ministry of Industry and Trade and in the procedure of implementation of infrastructure construction.