Malibu Hoi An project has kicked off from September 2018. Up to date, the mockup villas have been done 90%. Foundation of Condotels and Villas are on the way. Malibu Hoi An is expected to be done in time.
The mockup villas have been done basically
![](http://www.bamboocap.com.vn/sites/default/files/images/IMG_2012.JPG)
Foundation of Condotel is under construction
![](http://www.bamboocap.com.vn/sites/default/files/images/1(29).jpg)
1st floor of Villas are under construction
Source: BCG