TRACODI CONSTRUCTION HOLDINGS JOINT STOCK COMPANY 
  • Construction Value: $300 million.
  • Capacity: 150 MW.
  • Survey area: 3.800 ha.
  • Construction period: 2019 – 2020.
 
Soc Trang has an average annual wind speed of 6-6.2 m/s and a coastline of 72 km. After assessment of wind power potential, the parent company BCG has proposed to invest in BCG Wind Farm project in Tran De (Soc Trang).

Other news

DONG THANH 2

DONG THANH 2

  • Construction Value: $69,7 M
  • Wattage: 120 MW
  • Location: Tra Vinh
  • Expected finish: 2023
DONG THANH 1

DONG THANH 1

  • Construction Value: $51,6 M
  • Wattage: 80 MW
  • Location: Tra Vinh
  • Expected finish: 2023