TRACODI CONSTRUCTION HOLDINGS JOINT STOCK COMPANY 
  • Construction Value: $2,6 M
  • Wattage/year: 3.25 MW
  • Area: 29,250 m2
  • Status: Completed
  • Location: Binh Duong

Other news

VINAMILK

VINAMILK

  • Construction Value: $13,8 M
  • Wattage/year: 14.2 MW
  • Area: 117,015 m2
  • Status: Completed
  • Location: Binh Đinh, Quang Ngai, Da Lat
SONNY

SONNY

  • Construction Value: $0,8 M
  • Wattage/year: 1.0 MW
  • Area: 6,866 m2
  • Status: Completed
  • Location: Binh Duong